Finalists Coming October 13!

The Last Drops of Mexico City

Long Lead PROJECT
The Last Drops of Mexico City by Long Lead

credits

Title
  • The Last Drops of Mexico City
Entrant
  • Long Lead

About This Project

Summary

Mexico City's drinking water crisis is a complex, longstanding problem rooted in a number of exacerbating factors, from climate change and over-development to pollution and chaotic population growth. In this visual essay, Long Lead partnered with Magnum Photos to publish photography by Jérôme Sessini that documents the Mexican capital’s diminished drinking water supply, with a lens fixed on the people impacted most by this arid new reality.

Goals & Objectives

Without enough water to keep it afloat, Mexico City is literally sinking under the weight of its own ambition and growth. The goal of this feature is to raise awareness of the consequences of climate change by showing how Mexico's lakes have dried up, reservoirs drained low, and taps have run dry.

Results & Impact

This feature combines rich context of Mexico’s drought and struggling water treatment infrastructure with human elements to bring a level of empathy not often seen in climate reporting. Over 50,000 people—mostly in the increasingly arid US—engaged with the feature through email and social campaigns.

the team

Jerome Sessini
  • Photographer/Writer
  • Magnum Photos
Rodrigo Cervantes
  • Writer/Editor
  • Long Lead
Alan Yàñez
  • Videographer
  • Magnum Photos
Sarah Rogers
  • Creative Director
  • Long Lead
John Patrick Pullen
  • Editor
  • Long Lead
Emily Barone
  • Managing Editor
  • Long Lead
Alejandra González Romo
  • Fact Checker
  • Long Lead
Karin Halperin
  • Copy Editor
  • Long Lead
Jensen Rubinstein
  • Audience Development Manager
  • Long Lead
Web Design and Development
  • Decimal Studios